Discovering cement: Gas conditioning towers
Process phase: gas conditioning towers
CTP Team Italy signed a turnkey EPC contract with Cimpor for no. 2 new Waste Heat Recovery System in Souselas and Alhanadra plants, Portugal.
Medcem fabrika is announcing the construction of the new cement line in Mersin plant equipped with a Waste heat recovery system 10 MWhe.
Scope: ESP convertion into fabric filter. SWAP Technology cleaning system.
Country: Thailand.
The first US incentive for installing waste heat to power technology
Revamping fabric filter
After some years of operation the existing filter was no more able to meet with the emissions regulations.
Organic Rankine Cycle Technology
WHR ORC-based design with dual loop configuration to produce clean energy.
Indoor Fabric Filter
Following the revamping of the grinding mill system in 2016, replacement of existing mill filtration system with a new Fabric Filter with higher capacity and performances.
How can the industrials ensure that the existing air pollution control (APC) system still performs within the threshold inlet parameters and this does not lead to premature wear of its internal components and uncontrolled energy consumption?
Scope: ESP CONVERTION INTO FABRIC FILTER
Country: Pakistan
After the first successful WHR project in Turkey, CTP Team brings energy saving to Sonmez Cement plant
After the first two successful WHR projects in Turkey, CTP Team brings energy saving to Secil-Outão Cement plant
Scope: PROCESS FABRIC FILTER
Country: Indonesia
Scope: PROCESS FABRIC FILTER
Country: Indonesia
Scope: ESP CONVERTION INTO FABRIC FILTER
Country: Thailand
CTP Team support the growth and the specific needs of Ipoh Cement plant in comply with the new regulation for dust emission at the stack.
Installation of a Waste Heat Recovery System to support the efficiency and sustainability objectives in Cimko Narli Cement plant.
To discuss about your project, or for any other information, please contact us: