Discovering cement: Air to Air Heat exchanger
Process phase: air to air heat exchanger
CTP Team Italy signed a turnkey EPC contract with Cimpor for no. 2 new Waste Heat Recovery System in Souselas and Alhanadra plants, Portugal.
Medcem fabrika is announcing the construction of the new cement line in Mersin plant equipped with a Waste heat recovery system 10 MWhe.
OTP division successfully finalises the rerouting of ducts and full review of the engineering design of APC system
Analysis how much heat can be recovered from a cement line and the impacts on the sustainability of the cement industry.
Scope: ESP convertion into fabric filter. SWAP Technology cleaning system.
Country: Thailand.
Revamping fabric filter
After some years of operation the existing filter was no more able to meet with the emissions regulations.
ESP conversion in Fabric Filter
Same technology & different application: APC system with on kiln&raw mill, with APC system on cement mill.
Organic Rankine Cycle Technology
WHR ORC-based design with dual loop configuration to produce clean energy.
ESP convertion into fabric filter
Technical solution with multiple compartments in the clean gas side only. Suitable to close one of six compartments in case of dust emission problem.
Scope: ESP CONVERTION INTO FABRIC FILTER
Country: Pakistan
After the first successful WHR project in Turkey, CTP Team brings energy saving to Sonmez Cement plant
After the first two successful WHR projects in Turkey, CTP Team brings energy saving to Secil-Outão Cement plant
We offers a range of cost-effective solutions to modernize the existing air pollution control systems.
CTP Team as main contractor of EPC project partner with the OEM of critical equipment in order to guarantee to customers the proper execution and performance of each systems in the whole process.
We are able to design and install equipment in brown field with minimum impact on existing production facilities.
Scope: PROCESS FABRIC FILTER
Country: Indonesia
Scope: PROCESS FABRIC FILTER
Country: Indonesia
Scope: ESP CONVERTION INTO FABRIC FILTER
Country: Thailand
CTP Team support the growth and the specific needs of Ipoh Cement plant in comply with the new regulation for dust emission at the stack.
Installation of a Waste Heat Recovery System to support the efficiency and sustainability objectives in Cimko Narli Cement plant.
Turkey’s first energy generation plant which will generate energy from Waste Heat using the technology of ‘Organic Rankine Cycle’ project will be carried out by CTP Team Italy.