Skip to content
CTP
International engineering and manufacturing Company with 50 years of experience
CTP
  • Home
  • About us
  • Solutions
    • PRODUCTS
      • Menu iconAir pollution control
        • Menu iconProcess Filter & Swap Technology
        • Menu iconNuisance Filters
      • Menu iconWaste heat recovery
      • Menu iconGas cooling
    • SERVICES
      • Menu iconOptimisation, Technology & Performance
      • Menu iconIn-house engineering
      • Menu iconFull Project Management
      • Menu iconEngineering Advisory Support
      • Menu iconOn-site Services
      • Menu iconAfter sales services
  • Industries
    • Menu iconCement
    • Menu iconBiomass
    • Menu iconGlass
    • Menu iconIron & Steel
    • Menu iconPower
    • Menu iconWtE
  • Case histories and insights
  • News
  • Contacts

Search:
  • Home
  • About us
  • Solutions
    • PRODUCTS
      • Menu iconAir pollution control
        • Menu iconProcess Filter & Swap Technology
        • Menu iconNuisance Filters
      • Menu iconWaste heat recovery
      • Menu iconGas cooling
    • SERVICES
      • Menu iconOptimisation, Technology & Performance
      • Menu iconIn-house engineering
      • Menu iconFull Project Management
      • Menu iconEngineering Advisory Support
      • Menu iconOn-site Services
      • Menu iconAfter sales services
  • Industries
    • Menu iconCement
    • Menu iconBiomass
    • Menu iconGlass
    • Menu iconIron & Steel
    • Menu iconPower
    • Menu iconWtE
  • Case histories and insights
  • News
  • Contacts

Full Project Management

You are here:
  1. Home
  2. Entries tagged with "Full Project Management"
Insights

Discovering cement: Air to Air Heat exchanger

Process phase: air to air heat exchanger

Read more
Case histories

Waste Heat Recovery project for Oyak

CTP Team Italy signed a turnkey EPC contract with Cimpor for no. 2 new Waste Heat Recovery System in Souselas and Alhanadra plants, Portugal.

Read more
Insights

Discovering cement: Fabric filters

Process phase: fabric filters

Read more
Case histories

Sustainable expansion project for Medcem

Medcem fabrika is announcing the construction of the new cement line in Mersin plant equipped with a Waste heat recovery system 10 MWhe.

Read more
Insights

Discovering cement: bags cleaning

Process phase: Bags cleaning phase

Read more
Insights

Discovering cement: coal mill

Process phase: Cement grinding, Coal mill.

Read more
Case histories

Remove clogging dust along the process for MINE COMPANY

OTP division successfully finalises the rerouting of ducts and full review of the engineering design of APC system

Read more
Insights

Discovering cement: cement grinding

Process phase: Cement grinding, finish mill.

Read more
Insights

Discovering cement: raw material grinding

Process phase: Raw material grinding

Read more
Insights

Unexpected resource: recover your heat

Analysis how much heat can be recovered from a cement line and the impacts on the sustainability of the cement industry.

Read more
Insights

Discovering cement: equipment ventilation

Process phase: equipment ventilation

Read more
Case histories

Dedusting Kiln and Raw Mill for Asia Cement

Scope: ESP convertion into fabric filter. SWAP Technology cleaning system.
Country: Thailand.

Read more
Case histories

Revamping fabric filter for AKKORD SEMENT

Revamping fabric filter
After some years of operation the existing filter was no more able to meet with the emissions regulations.

Read more
Case histories

ESP conversion in Fabric Filter for POPULAR CEMENT

ESP conversion in Fabric Filter
Same technology & different application: APC system with on kiln&raw mill, with APC system on cement mill.

Read more
Case histories

Waste heat recovery for SONMEZ CEMENT

Organic Rankine Cycle Technology
WHR ORC-based design with dual loop configuration to produce clean energy.

Read more
Case histories

ESP convertion into fabric filter project for ASKARI (Wah)

ESP convertion into fabric filter
Technical solution with multiple compartments in the clean gas side only. Suitable to close one of six compartments in case of dust emission problem.

Read more
Case histories

ESP convertion into fabric filter project for ASKARI (Nizampur)

Scope: ESP CONVERTION INTO FABRIC FILTER
Country: Pakistan

Read more
Insights

Dual-loop waste heat recovery project for SONMEZ CEMENT

After the first successful WHR project in Turkey, CTP Team brings energy saving to Sonmez Cement plant

Read more
Case histories

Waste heat recovery with orc technology project for SECIL

After the first two successful WHR projects in Turkey, CTP Team brings energy saving to Secil-Outão Cement plant

Read more
Case histories

WHR system SRC-based for GOMEL GLASS

Scope: WHR system SRC-based
Country: Belarus

Read more
Insights

Upgrade & Retrofit solutions for air pollution control systems

We offers a range of cost-effective solutions to modernize the existing air pollution control systems.

Read more
Insights

OEM support of critical equipment for turn-key EPC projects

CTP Team as main contractor of EPC project partner with the OEM of critical equipment in order to guarantee to customers the proper execution and performance of each systems in the whole process.

Read more
Insights

Brown field expert in identifying and optimizing filters design

We are able to design and install equipment in brown field with minimum impact on existing production facilities.

Read more
Case histories

Process fabric filter project for INDARUNG

Scope: PROCESS FABRIC FILTER
Country: Indonesia

Read more
Case histories

SWAP Technology Process fabric filter project for REMBANG

Scope: PROCESS FABRIC FILTER
Country: Indonesia

Read more
Case histories

Fabric filter project for ASIA CEMENT

Scope: ESP CONVERTION INTO FABRIC FILTER
Country: Thailand

Read more
Case histories

ESP convertion into fabric filter project for TASEK CORPORATION BERHAD

CTP Team support the growth and the specific needs of Ipoh Cement plant in comply with the new regulation for dust emission at the stack.

Read more
Case histories

WHR SYSTEM ORC-based project for CIMKO NARLI

Installation of a Waste Heat Recovery System to support the efficiency and sustainability objectives in Cimko Narli Cement plant.

Read more
Insights

The first Waste Heat Recovery project with ORC technology been awarded to CTP Italy

Turkey’s first energy generation plant which will generate energy from Waste Heat using the technology of ‘Organic Rankine Cycle’ project will be carried out by CTP Team Italy.

Read more

CTP TEAM S.R.L
c/o Kilometro Rosso Innovation District
Building SPARK Gate 4
Via Stezzano, 87 – 24126 Bergamo (BG) – Italy
T. +39 035 6968501 | F. +39 035 6968546 | info@ctp.mi.it
P.iva/CF 04249630965 – Rea Cciaa di Bergamo n. 436468

Follow us on Linkedin…

  • Careers
  • Legal
  • Privacy policy
  • Cookie policy
© Copyright 2020 CTP TEAM S.R.L. All rights reserved

Powered by WordPress and il Camelopardo

Go to Top
Contact our experts

To discuss about your project, or for any other information, please contact us:

  • T. +39 035 6968501
  • General inquiries: info@ctp.mi.it

Or find our expert most suitable for your needs…